top of page
CASE STUDY

Real installs. Real problems. The product we actually shipped.

Every project below was supplied or refurbished by DS Filtration. Names withheld at customer request — happy to make introductions on request.

Oil/Water Separator install

Trade-waste compliance for a Victorian engineering workshop

Problem

Workshop discharging compressor condensate to a trade-waste pit was flagged for hydrocarbon levels above local council limits.

Solution

Specified and supplied a Sepura-class oil/water separator sized to the existing 75 kW compressor station, with a zero-loss electronic drain replacing the failing timer drain on the receiver.

Outcome

Discharge water now within trade-waste limits. Service kits stocked locally — annual changeover handled in under an hour.

Filter housing rollout

Ten-line filter upgrade for a food packaging plant

Problem

Existing aluminium filter housings were past service life, with documented oil carry-over risk into a food-contact packaging line.

Solution

Supplied a full set of compressed air filters with coalescing + activated carbon stages, plus differential pressure indicators on every housing for compliance.

Outcome

Line passed its next ISO 8573-1 audit at Class 2 air, with documented filter change schedule supplied for the QA file.

FP12X1XA_web_edited.png
Fruilair_FT_Series.png
Cross-reference supply

Cross-reference program for a national compressor service contractor

Problem

Contractor servicing a mixed Atlas Copco / Donaldson / Hankison fleet was juggling three OEM accounts and 6-week part lead times.

Solution

Built a stocked cross-reference list of the contractor's top 40 element part numbers, held in Boronia and dispatched on PO.

Outcome

Single supplier, single PO, parts dispatched same day on stocked items. Contractor reports faster service callouts and better service margin per visit.

Refrigerated dryer replacement

Dryer replacement at a regional manufacturing site

Problem

Existing refrigerated dryer was running on a phased-out refrigerant and tripping intermittently, dropping +3°C dew point under summer load.

Solution

Supplied a cycling refrigerated dryer matched to compressor cfm, with R-513A refrigerant and integrated zero-loss drain.

Outcome

Stable +3°C pressure dew point. Site reports lower dryer power draw under part-load conditions through cycling control.

Refrigerant-Dryers.jpg
ultrapac_donaldson_web.png
Desiccant dryer install

−40°C dew point for an instrument-air application

Problem

Plant control instruments were specifying ISO 8573-1 Class 2 water, which the existing refrigerated dryer could not deliver.

Solution

Supplied a heatless adsorption dryer with twin-tower design plus pre/after-filtration package and a dew-point monitor.

Outcome

Documented −40°C pressure dew point at the instrument header, audit-ready dew-point log.

Ultrasonic refurbishment

Filter housing refurbishment instead of replacement

Problem

Customer had eight large aluminium filter housings caked with oil residue. Replacement cost > $30,000 with 8-week OEM lead.

Solution

Ultrasonic cleaning of all eight housings at our Boronia facility, with inspection report on each.

Outcome

Housings returned to service in under one week at a fraction of replacement cost. Inspection report kept on file for the next audit.

Ultrasonic_Cleaning_web-scaled.jpg

Send us your part number. We’ll send you a quote — usually same day.

One Melbourne supplier for filters, dryers, separators and drains. Trade discounts, New-Zeeland-wide delivery, real people on the phone.

bottom of page